GSO IEC 62862-1-5:2025
IEC 62862-1-5:2024
Gulf Standard
Current Edition
·
Approved on
14 October 2025
Solar thermal electric plants - Part 1-5: Performance test code for solar thermal electric plants
GSO IEC 62862-1-5:2025 Files
English
87 Pages
Current Edition
Reference Language
Obtaining this standard through the store is currently unavailable.
You can acquire it directly from its source or from one of the member countries stores
GSO IEC 62862-1-5:2025 Scope
IEC 62862-1-5:2024 provide procedures and guidelines to carry out acceptance tests for solar thermal power plants, of any concentration technology, with the uncertainty level given in ISO/IEC Guide 98-3.
This document establishes the measurements, instrumentation and techniques required for determining the following performance parameters for a given period:
- available solar radiation energy,
- plant electricity consumptions,
- net electricity generation,
- non-solar energy,
- net plant efficiency.
This document specifies the characteristics of a calculation tool that serves as a reference for expected electricity production during the test period and under real-time solar irradiance and other meteorological data.
This document is applicable to solar thermal power plants of any size using any concentration technology, where the sun is the main source of energy, and all elements and systems are operative. Such power plants can optionally have non-solar energy sources, such as natural gas or other renewable energies, and a thermal storage system.
This document is applicable to acceptance testing in such power plants, as well as in any other scenario in which their performance must be known.
This document establishes the measurements, instrumentation and techniques required for determining the following performance parameters for a given period:
- available solar radiation energy,
- plant electricity consumptions,
- net electricity generation,
- non-solar energy,
- net plant efficiency.
This document specifies the characteristics of a calculation tool that serves as a reference for expected electricity production during the test period and under real-time solar irradiance and other meteorological data.
This document is applicable to solar thermal power plants of any size using any concentration technology, where the sun is the main source of energy, and all elements and systems are operative. Such power plants can optionally have non-solar energy sources, such as natural gas or other renewable energies, and a thermal storage system.
This document is applicable to acceptance testing in such power plants, as well as in any other scenario in which their performance must be known.
Best Sellers From Electrical Sector
GSO 2530:2016
Gulf Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
GSO 34:2007
Gulf Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES
GSO 35:2007
Gulf Standard
Methods of test
for lead-acid starter batteries used for motor vehicles
and internal combustion engines
GSO 2693:2022
Gulf Standard
The GCC Terrestrial Radio Receiver Specifications for AM/FM/T-DAB+
Recently Published from Electrical Sector
GSO IEC 60404-12:2025
IEC 60404-12:2023
Gulf Standard
Magnetic materials - Part 12: Methods of test for the assessment of the thermal endurance of surface insulation coatings on electrical steel strip and sheet
GSO ISO 30061:2025
ISO 30061:2007
Gulf Standard
Emergency lighting
GSO IEC 60335-2-26:2025
IEC 60335-2-26:2024
Gulf Standard
Household and similar electrical appliances - Safety - Part 2-26: Particular requirements for clocks
GSO IEC 61058-2-1:2025
IEC 61058-2-1:2018
Gulf Standard
Switches for appliances - Part 2-1: Particular requirements for cord switches