GSO IEC 61968-5:2024

IEC 61968-5:2020
Gulf Standard   Current Edition · Approved on 14 October 2024

Application integration at electric utilities - System interfaces for distribution management - Part 5: Distributed energy optimization

GSO IEC 61968-5:2024 Files

English 99 Pages
Current Edition Reference Language

GSO IEC 61968-5:2024 Scope

IEC 61968-5:2020 is the description of a set of functions that are needed for enterprise integration of DERMS functions. These exchanges are most likely between a DERMS and a DMS. However, since this is an enterprise integration standard which may leverage IEC 61968-100:2013 for application integration (using web services or JMS) or other loosely-coupled implementations, there are no technical limitations for systems with which a DERMS might exchange information. Also, it should be noted that a DERMS might communicate with individual DER using a variety of standards and protocols such as IEC 61850, IEEE 2030.5, Distribution Network Protocol (DNP), Sunspec Modbus, or perhaps Open Field Message Bus (OpenFMB). One role of the DERMS is to manage this disparity and complexity of communications on the behalf of the system operator. However, the communication to individual DER is out of scope of this standard. Readers should look to those standards to understand communication to individual DER’s smart inverter.
The scope will be limited to the following use case categories:
• DER group creation – a mechanism to manage DER in aggregate
• DER group maintenance – a mechanism to add, remove, or modify the members and/or aggregated capabilities of a given group of DER
• DER group deletion – removing an entire group
• DER group status monitoring – a mechanism for quantifying or ascertaining the current capabilities and/or status of a group of DER
• DER group forecast – a mechanism for predicting the capabilities and/or status of a group of DER for a given time period in the future
• DER group dispatch – a mechanism for requesting that specified capabilities of a group of DER be dispatched to the grid
• DER group voltage ramp rate control – a mechanism for requesting that a DER group following a ramp rate curve
• DER group connect/disconnect – a mechanism to request that DER either isolate themselves, or reconnect to the grid as needed.

Best Sellers From Electrical Sector

GSO 2530:2016
 
Gulf Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
GSO 34:2007
 
Gulf Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR MOTOR VEHICLES AND INTERNAL COMBUSTION ENGINES
GSO 35:2007
 
Gulf Standard
Methods of test for lead-acid starter batteries used for motor vehicles and internal combustion engines
GSO 1899:2016
 
Gulf Standard
GCC Standard voltages and frequencies for AC transmission and distribution systems

Recently Published from Electrical Sector

GSO IEC 63522-32:2026
IEC 63522-32:2025 
Gulf Standard
Electrical relays - Tests and measurements - Part 32: Acoustic noise
GSO IEC 61362:2026
IEC 61362:2024 
Gulf Standard
Guidelines to specification of hydraulic turbine governing systems
GSO IEC TS 62271-313:2026
IEC TS 62271-313:2025 
Gulf Standard
High-voltage switchgear and controlgear - Part 313: Direct current circuit-breakers
GSO IEC TR 63411:2026
IEC TR 63411:2025 
Gulf Standard
Grid connection of offshore wind via VSC-HVDC systems