GSO ASTM C1097:2014

ASTM C1097:13
Gulf Standard   Current Edition · Approved on 25 December 2014

Standard Specification for Hydrated Lime for Use in Asphalt Cement or Bituminous Paving Mixtures

GSO ASTM C1097:2014 Files

English 2 Pages
Current Edition Reference Language

GSO ASTM C1097:2014 Scope

This specification covers high calcium, dolomitic and magnesian-hydrated lime for use in asphalt cement or bituminous pavements. Hydrated lime, either dry or slurry form, shall conform to the chemical composition requirements for calcium and magnesium oxides, carbon dioxide, unhydrated calcium and magnesium oxides, and free moisture of dry hydrates as shall be determined by chemical analysis. The particle size of hydrated lime shall also be determined using a standardized spray nozzle and pressure gauge. This abstract is a brief summary of the referenced standard. It is informational only and not an official part of the standard; the full text of the standard itself must be referred to for its use and application. ASTM does not give any warranty express or implied or make any representation that the contents of this abstract are accurate, complete or up to date.

Best Sellers From Construction and Building Sector

GSO 1431:2002
 
Gulf Technical Regulation
Sanitary appliances - pressurized flushing devices
GSO 1427:2008
 
Gulf Standard
Ceramic Sanitary Appliances - Western Water Closets
GSO 1421:2002
 
Gulf Technical Regulation
Hollow blocks made from clay for walls
GSO 440:2007
 
Gulf Standard
Calcium Silicate bricks

Recently Published from Construction and Building Sector

GSO 113:1989
 
Gulf Standard
TECHNICAL TERMS AND DEFINITIONS USED IN SPINNING AND WEAVING INDUSTRY PART 2: FABRIC DEFECTS
GSO ASTM C494/C494M:2025
ASTM C494/C494M:24 
Gulf Standard
Standard Specification for Chemical Admixtures for Concrete
GSO ASTM C1767:2025
ASTM C1767:21 
Gulf Standard
Standard Specification for Stainless Steel Jacketing for Insulation
GSO ISO 22185-2:2025
ISO 22185-2:2024 
Gulf Standard
Diagnosing moisture damage in buildings and implementing countermeasures — Part 2: Assessment of conditions